Donate using PayPal

Recent photos and other lists

The 36 newest photos

Bike share point in Brighton

Cycle lane

Mill Road Depot site under construction, which will have the Chisholm Trail along it

Cycle parking at the lido

The world’s first ambulance bicycle - exhibit at the Science Museum

Canal route

Canal path

Canal path

Canal path

Bicycles and motorbikes fished out the canal

Coldham’s Common

Busway derailment

The kind of pre-war cycleway that Carlton Reid is recording.

Improved section of NCN route 51

Improved section of NCN route 51

No idea what this sign is about

Chisholm Trail construction site

It's coming! - the Chisholm Trail

No idea why this route sign ended up here - it's nowhere near a junction.

Start of the cycleway on Arbury Road - but it should be properly integrated with the route to the southwest.

End of the cycleway on Arbury Road

Cycle route northeast from the parallel crossing of Arbury Road

Parallel crossing on Arbury Road - but the cycleways should continue to the southwest.

Dutch-style cycleways and crossing at St Laurence primary school

Dutch-style cycleway, Arbury Road - but shouldn't there be a cycleable connection to the community centre rather than barriers to the left?

Some mistake surely? Northbound cycle lane, northbound general traffic lane, but at least southbound cyclists can use the footway here.

Some mistake surely? Northbound cycle lane, northbound general traffic lane, no southbound cycle lane.

Some mistake surely? Northbound cycle lane, northbound general traffic lane, no southbound cycle lane.

Southbound cycle lane through the Histon Road roadworks - the yellow signs now say 'Reading this whilst driving a Motor Vehicle? You're driving ILLEGALLY the wrong way. CCTV in operation. You have been REPORTED'

The current state of the long-term roadworks on Histon Road - northbound traffic lane, southbound cycle lane

What was supposed to be a segregated cycle lane on Balls Pond Road is now a disappointing painted lane. Notice the cab already using it and squeezing the cyclist to the curb. There will be cars parked there just you wait #CS1@ @hackney_cyc ... [more]

Dropped kerb at Barnwell Meadow where Chisholm Trail will meet Newmarket Road. Significant remaining upstand renders it dangerous for oblique approach.

New dropped kerb at Barnwell Meadow where the Chisholm Trail will meet Newmarket Road. It's not even close to 'flush', and potentially very dangerous for any oblique approach from the on-road painted cycle lane.

Reinstated bollard at Jubilee path. Gaps to the wooden fences on either side are about 1.8m and 2.0m.

Unpaved cross-border link from Flensburg to Padborg

Start of the cross-border link to Padborg (Denmark)

^ Return to top

The 12 most recently modified photos

@Cambs_Traffic @SmithsonHill You mean this "obstruction"? https://t.co/P7ljnxfCiU

#live Cambridgeshire Guided Bus recovery underway https://t.co/ly9Z3R67JS https://t.co/BDt7BAnUzu See also index of Busway cameras: http://www.rtaylor.co.uk/cambscc-cambridge-cctv.html

Cambridge guided busway crash Feb 2016. Please feel free to use this picture. https://t.co/RqL2BeG49b

Video of a cyclist on a wider section of Histon Road. See also picture #51292

Right and left on CS1

Route signs (approximate location)

Cycleway in new housing development north of Flensburg

Route signs at crossroads north of Flensburg

Cut-through to housing development, Flensburg

Start of cycleway north from Flensburg

The German equivalent of a bridleway

Route signs north of Flensburg

^ Return to top

Recent placeholders

^ Return to top

  • Icon 155926 Turn into Cycle path
  • Icon 155925 Make it safe for children cycling
  • Icon 155924 Waterend Lane is very poorly maintained. It has many potholes. Rainwater is not diverted from the road surface so that mud and gravel are deposited on the surface. It could be a pleasant, quiet route for cyclists.
  • Icon 155923 The cobbled cycle way is so uneven and dangerous - needs resurfacing. Heading north is particularly bad.
  • Icon 155922 Cycle Link needed between this point and Station Road (currently linked by a footpath) to provide safer route for young cyclists to the play park AND the school in order to avoid double bends on a busy road. Only alternative is to cycle on the busy road negotiating double bends.
  • Icon 155921 Cycle Link needed between this point and Mellows Close (currently linked by a footpath) to provide safer route for young cyclists to the play park AND the school in order to avoid double bends on a busy road. Only alternative is to cycle on the busy road negotiating double bends.
  • Icon 155920 Underused car park extend play area and improve area
  • Icon 155919 Create off road cycle paths to link Eaton Road to Elm Drive to create a quietway cycle route parallel to Hatfield Road for local people to get to schools and shops.
  • Icon 155918 As this is a road for vehicles to access the Inn on the Park, allow cycling to get to this useful cafe.
  • Icon 155917 Widen the path as simply too narrow for cycling and walking on busy weekend days. Needs to be 4m wide here.
  • Icon 155916 Widen this path as too narrow for cycling and walking on busy weekend days.
  • Icon 155915 Widen the central island in the Sainsbury's entrance to enable families with trailers to cross in two stages. Very busy crossing and drivers not looking out for cyclists or pedestrians.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://southampton.cyclestreets.net/photomap/recent/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.